Monday 25 June 2012

25th June 2012 - Engine and wheels

Alot of time was spent cleaning and polishing the engine block, it was carefully put back in along with the newly powdercoated centre and side stands. The clutch side cover was polished by my grandad and put back on with new screws.



wheel rims finally arrived after 2 months and alot of hassle. The hubs and spokes were cleaned up and the wheels rebuilt with new tyres.


The rear wheel was put in first and the bike could now be put on its centre stand to stabilise it.


The front wheel along with the newly painted front mudgaurd could now go back on.